Skip to main content

Capability

Quality Control.

Fit-up, dimensional and weld inspection with heat-number traceability.

CWI on SiteNDT per customer specITP friendly
Request a Quote
David Salinas, Director of Fabrication (903) 665-8080 dsalinas@hawkepc.com

Quality control runs through the whole job, starting before the first weld. The shop checks fit-up and dimensions before welding, inspects welds visually, and keeps material traceability through heat-number tracking so every piece can be traced back to its source material. Welding procedure control and welder qualification records back up every weld, and a Certified Welding Inspector signs off on the floor. NDT runs to the customer's spec when required, and the shop is ITP friendly for jobs that need one. Inspection documentation, paint reports and a final inspection close out the paper trail before a piece ships.

Dimensional inspection
Weld inspection
Visual weld inspection
Material traceability
Heat-number tracking
Welding procedure control
Welder qualification records
Inspection documentation
Fit-up inspection
Final inspection
Paint Reports
CWI on Site
NDT per customer spec
ITP friendly

Related capabilities